The Role of Augmented Reality(AR)in Construction Project Planning and Execution

Authors

  • Athira C, K.Soundhirarajan Department of Civil Engineering, Gnanamani College of Technology (AUTONOMOUS), Namakkal, Tamil Nadu, India Author

DOI:

https://doi.org/10.15662/IJEETR.2026.0802159

Keywords:

3D models, BIM data, augmented reality (AR)

Abstract

One of the most exciting advancements in modern construction is the use of augmented reality (AR). AR technology can revolutionize how construction teams work, from design visualization and collaboration to on-site construction assistance and improved long-term maintenance. Augmented reality provides various benefits that can help companies create the world of tomorrow more efficiently and effectively. It enhances efficiency and accuracy by overlaying digital information, like 3D models and blueprints, onto the physical job site. Its roles include improving visualization for better planning, ensuring construction matches design through on-site checks, boosting safety via simulated training, facilitating remote assistance and collaboration, and streamlining maintenance and inspections by providing real-time data access.It provides a range of benefits that can help companies create the world of tomorrow more effectively and efficiently. Let’s explore some of the benefits of AR in construction.Now, augmented reality can incorporate CAD and BIM data to create detailed 3D models that overlay the real world. CAD has enhanced accuracy and consistency. BIM has created more detail and collaboration.AR is the next natural step for construction innovation, and it can enhance design, construction, maintenance, and on-site management.Augmented reality can share information and data in real-time, allowing professionals from different disciplines to work together more effectively. Miscommunication and project management errors can result in higher costs and missed deadlines, which may lead stakeholders to lose confidence.AR allows workers to visualize and discuss design plans, share measurements, and track progress. More detailed data enables site managers, contractors, and superintendents to keep detailed reports and adjust work accordingly

References

1. A Review on Using Opportunities of Augmented Reality and Virtual Reality in Construction Project Management, by S. Ahmed. Organization, Technology and Management in Construction: an International Journal, Vol. 11, Issue 1 (2019),

2. pp. 1839- 1852. DOI: 10.2478/otmcj-2018-0012.

3.

4. Augmented Reality in the Construction Industry: Use- Cases, Benefits, Obstacles, and Future Trends, Frontiers in Built Environment, 2022. DOI in article.

5. Integration of Augmented Reality and Building Information Modeling for Enhanced Construction Inspection—A Case Study, Buildings 2024, Vol. 14(3), 612. DOI: 10.3390/buildings14030612.

6. Augmented Reality Framework for Retrieving Information of Moving Objects on Construction Sites, Buildings (MDPI) 14(7):2089. DOI info in article.

7. Exploring Augmented Reality Applications in Malaysian Construction Industry, Jurnal Intelek, Vol. 20, Issue 1. DOI: 10.24191/ji.v20i1.3813.

8. Augmented Reality for Construction Site Monitoring and Documentation, IEEE Proceedings (Feb. 2014) by S. Zollmann et al. DOI: 10.1109/JPROC.2013.2294314.

9. C.Nagarajan and M.Madheswaran - ‘Stability Analysis of Series Parallel Resonant Converter with Fuzzy Logic Controller Using State Space Techniques’- Taylor &Francis, Electric Power Components and Systems, Vol.39 (8), pp.780-793, May 2011. DOI: 10.1080/15325008.2010.541746

10. C.Nagarajan and M.Madheswaran - ‘Experimental verification and stability state space analysis of CLL-T Series Parallel Resonant Converter’ - Journal of Electrical Engineering, Vol.63 (6), pp.365-372, Dec.2012. DOI: 10.2478/v10187-012-0054-2

11. C.Nagarajan and M.Madheswaran - ‘Performance Analysis of LCL-T Resonant Converter with Fuzzy/PID Using State Space Analysis’- Springer, Electrical Engineering, Vol.93 (3), pp.167-178, September 2011. DOI 10.1007/s00202-011-0203-9

12. S.Tamilselvi, R.Prakash, C.Nagarajan,“Solar System Integrated Smart Grid Utilizing Hybrid Coot-Genetic Algorithm Optimized ANN Controller” Iranian Journal Of Science And Technology-Transactions Of Electrical Engineering, DOI10.1007/s40998-025-00917-z,2025

13. S.Tamilselvi, R.Prakash, C.Nagarajan,“ Adaptive sliding mode control of multilevel grid-connected inverters using reinforcement learning for enhanced LVRT performance” Electric Power Systems Research 253 (2026) 112428, doi.org/10.1016/j.epsr.2025.112428

14. S.Thirunavukkarasu, C. Nagarajan, 2024, “Performance Investigation on OCF and SCF study in BLDC machine using FTANN Controller," Journal of Electrical Engineering And Technology, Volume 20, pages 2675–2688, (2025), doi.org/10.1007/s42835-024-02126-w

15. C. Nagarajan, M.Madheswaran and D.Ramasubramanian- ‘Development of DSP based Robust Control Method for General Resonant Converter Topologies using Transfer Function Model’- Acta Electrotechnica et Informatica Journal , Vol.13 (2), pp.18-31,April-June.2013, DOI: 10.2478/aeei-2013-0025.

16. C.Nagarajan and M.Madheswaran - ‘DSP Based Fuzzy Controller for Series Parallel Resonant converter’- Springer, Frontiers of Electrical and Electronic Engineering, Vol. 7(4), pp. 438-446, Dec.12. DOI 10.1007/s11460-012-0212-0.

17. C.Nagarajan and M.Madheswaran - ‘Experimental Study and steady state stability analysis of CLL-T Series Parallel Resonant Converter with Fuzzy controller using State Space Analysis’- Iranian Journal of Electrical & Electronic Engineering, Vol.8 (3), pp.259-267, September 2012.

18. Soundappan, S. J. (2020). Big Data Analytics in Healthcare: Applications for Pandemic Forecastin. International Journal of Advanced Research in Computer Science & Technology (IJARCST), 3(1), 2248-2253.

19. C.Nagarajan and M.Madheswaran, “Analysis and Simulation of LCL Series Resonant Full Bridge Converter Using PWM Technique with Load Independent Operation” has been presented in ICTES’08, a IEEE / IET International Conference organized by M.G.R.University, Chennai.Vol.no.1, pp.190-195, Dec.2007

20. Suganthi Mullainathan, Ramesh Natarajan, “An SPSS and CNN modelling based quality assessment using ceramic materials and membrane filtration techniques”, Revista Materia (Rio J.) Vol. 30, 2025, DOI: https://doi.org/10.1590/1517-7076-RMAT-2024-0721

21. M Suganthi, N Ramesh, “Treatment of water using natural zeolite as membrane filter”, Journal of Environmental Protection and Ecology, Volume 23, Issue 2, pp: 520-530,2022

22. Parascho, S. (2023). Construction Robotics: From Automation to Collaboration. Annual Review of Control, Robotics, and Autonomous Systems, 6, 183 204. Annual Reviews

23. Halder, S., & Afsari, K. (2023). “Robots in Inspection and Monitoring of Buildings and Infrastructure: A Systematic Review.” Applied Sciences, 13(4), 2304. MDPI

Downloads

Published

2026-03-28

How to Cite

The Role of Augmented Reality(AR)in Construction Project Planning and Execution. (2026). International Journal of Engineering & Extended Technologies Research (IJEETR), 8(2), 1896-1899. https://doi.org/10.15662/IJEETR.2026.0802159